LCE were appointed by the then Department of Water Affairs (MAWF), now NamWater, to design the structural and civil components of the new office accommodation for the Department in Windhoek. LCE’s responsibilities included the detailed structural design, the design of the civil engineering components, the foundation investigations, the construction supervision and quality control for the following components of the project: two 5-storey reinforced concrete office blocks, double storey reinforced concrete parking garage, heavy equipment workshop with 20 ton travelling crane, two warehouses and stores, water meter testing installation and building, soils laboratory, ablution facilities, spray painting and sand blasting workshops, 200 m3 underground reinforced concrete reservoir, 200 m3 steel elevated reservoir, undercover parking garages, paved road works, sewage and water reticulation networks, retaining walls and general site works.
Location: Windhoek
Completion: 1987
Commencement: 1984